Extras

After months of planning and testing, the Seahorse is transported to its permanent site.
Seahorse on the Water

It is now time to see, after all the designing and planning, if the Seahorse can float.
The First Test

Incredible new technology is being launched to ensure healthy, fast-growing coral reefs.
Electro-Reef

Marie Goarin talks us through the unique coral garden that is a feature of each Seahorse.
Coral Garden

The Team Stumbles Upon a Problem Inside the Building
Mark Morabito must conduct a floor-by-floor inspection of the building every day.
The Team Stumbles Upon a Problem Inside the Building

Strengthening the Ground Using Vibro Compaction
Before construction can begin, the sand must be compacted using "vibro compaction."
Strengthening the Ground Using Vibro Compaction

The Heart of Europe’s Emergency Response Team
The Heart of Europe has created its own Emergency Response Unit (ERU).
The Heart of Europe’s Emergency Response Team

The Heart of Europe’s Desert Jungle
Landscape Gardner Richard Westcott must create a “desert jungle” on the islands.
The Heart of Europe’s Desert Jungle

Creating the Scorpion Tower’s Silky Aesthetic
The exoskeleton of the Scorpion Tower is created using glass fiber reinforced concrete.
Creating the Scorpion Tower’s Silky Aesthetic

Buck Hoists Play an Essential Role in Building the Tower
To transport materials the team uses two elevators known as buck hoists.
Buck Hoists Play an Essential Role in Building the Tower

Episode 3 Preview | The Floating House
Follow the construction of a multi-million dollar floating home.
Episode 3 Preview | The Floating House

Episode 2 Preview | Europe in the Desert
Trace one man’s dream to transform six sand islands into a luxurious holiday destination.
Episode 2 Preview | Europe in the Desert
Support for PBS.org provided by: