The builders have moved the abutments so they don't have to cut down a mature tree. However, the new placement doesn't leave enough room for the prefabricated elements on the riverbanks.

This means the team must abandon the plan of lowering two sides of the bridge from either bank. Instead, the men will build the bridge's arch while perched on two boats in the river.

Previous   Next



NOVA Builds a Rainbow Bridge | Bridge the Gap | Nature's Miracle Material
China's Age of Invention | Resources | Transcript

Medieval Siege | Pharaoh's Obelisk | Easter Island | Roman Bath | China Bridge | Site Map

Editor's Picks | Previous Sites | Join Us/E-mail | TV/Web Schedule
About NOVA | Teachers | Site Map | Shop | Jobs | Search | To print
PBS Online | NOVA Online | WGBH

© | Updated November 2000

Support provided by

For new content
visit the redesigned
NOVA site