The builders have moved the abutments so they don't have to
cut down a mature tree. However, the new placement doesn't
leave enough room for the prefabricated elements on the
riverbanks.
This means the team must abandon the plan of lowering two
sides of the bridge from either bank. Instead, the men will
build the bridge's arch while perched on two boats in the
river.