 Buy the "Great Projects" videos and companion book at ShopPBS.
 |
 |
 |
   |
|
 |
  
    
  


 |
4.4 Million Cubic Yards of Concrete A web of cableways was strung high above the canyon floor, where concrete was poured from large containers. Water from the river was diverted into a web of pipes to cool the blocks of concrete. If the dam had been built as a single monolithic mass, it would not have fully cooled for more than a century.