May: Major John Wesley Powell makes the first recorded trip through the Grand Canyon and down the length of the Colorado River. The
one-armed Civil War veteran followed this expedition with a second trip down
the Colorado in 1871, when he conducted geological studies that greatly
expanded understanding of the topography of the region.

April: President Theodore Roosevelt signs the Reclamation Act.
Reclamation Service engineers begin their long series of investigations and
reports on control and possible uses of the Colorado River.

March: Torrential rains begin and lead to the Colorado River
breaking into the Imperial Valley, creating an inland sea across a hundred and
fifty square miles. It was two years, at a cost of more than $3 million, before
the river is contained within its original channel. Blaine Hamann, former
Bureau of Reclamation employee, recalls, "The river was an enemy, and only in
short periods of time could you look at it as a useful river. Most of the time
it was something that would kill you or ruin your farm."

April: Congress passes the Kinkaid Act authorizing the Secretary
of Interior to investigate problems of Imperial Valley.

February: Arthur P. Davis is the chief author of the Fall-Davis
report entitled "Problems of Imperial Valley and Vicinity." Prepared under the
Kinkaid Act and submitted to Congress, the report recommended construction of a
high dam on the Colorado River at or near Boulder Canyon. The report also
suggested that the government could recoup the cost of construction by selling
the electric power generated by the dam to the cities in rapidly-expanding
Southern California.
November: Representatives of the seven Colorado River Basin States sign
the Colorado River Compact in Santa Fe, New Mexico. Later in the year, the
first of the Swing-Johnson bills to authorize a high dam and canal is
introduced in Congress.

December: The Colorado River Board of California reports
favorably on a feasibility study concerning the Boulder Canyon Dam Project. The
Boulder Canyon Project Act, introduced by Senator Hiram Johnson and
Representative Phil Swing, both of California, passes in the House and Senate,
and is signed by President Calvin Coolidge.

June: Herbert Hoover takes charge of
negotiations as six of seven basin states approve the Colorado River Compact.
The basin states include Arizona, California, Colorado, Nevada, New Mexico,
Utah, and Wyoming. Arizona, unhappy with the proposed plan for water
distribution, is the one state that held out against the Compact. The resulting
agreement leads to passage of the Boulder Canyon Project Act.
1931
March: The Bureau of Reclamation opens bids for the construction
of Boulder (Hoover) Dam and Power Plant. The contract is awarded to Six
Companies, a construction and engineering firm made up of some of the West's
most successful builders and designers of dams, bridges, roads, and tunnels, on
March 11. The winning bid was $48,890,995.

November: The Colorado River is diverted around the dam site.

June: First concrete is poured at Hoover Dam site.

February: The Hoover Dam starts impounding water in Lake Mead.
May: The last concrete is poured at the dam site.
September: President Franklin D. Roosevelt attends and speaks at the
dedication of Boulder (Hoover) Dam.

March: House Resolution 140, officially declaring that the dam at
Boulder Canyon be named Hoover Dam, for former President Herbert Hoover, is
introduced to Congress. It is passed two days later, moves on to be approved in
the Senate.
April: President Harry S. Truman signs resolution officially declaring
that the dam at Boulder Canyon be named Hoover Dam.
|
|