Skip to Main Content
American Experience

Grand Coulee Dam: Pouring the Concrete

It took millions of cubic yards of concrete to build Grand Coulee Dam.

04/03/2012 | Rating NR

American Experience

Grand Coulee Dam: Pouring the Concrete

Clip: Season 24 Episode 6 | 1m 56s

It took millions of cubic yards of concrete to build Grand Coulee Dam.

On December 6, 1935, the first bucket of concrete was poured onto the dam site. To prevent the possibility of cracking, concrete was poured into hundreds of 50 foot square blocks every 72 hours. After each pour, workers would scrub the concrete with wide brushes to remove scum. Millions of cubic yards were poured, and in February 1938, the foundation was completed 14 months ahead of schedule.

04/03/2012 | Rating NR

Problems playing video?   | Closed Captioning Feedback

Report a Problem

Before you submit an error, please consult our Video Help page.

Problems playing video?   | Closed Captioning Feedback

Report a Problem

Before you submit an error, please consult our Video Help page.

Corporate sponsorship for American Experience is provided by Liberty Mutual Insurance and Carlisle Companies. Major funding by the Alfred P. Sloan Foundation.

Support provided by:

Liberty Mutual InsuranceCarlisle

Grand Coulee Dam - Preview

Preview: S24 Ep6 | 30s | Airs Tuesday, February 18, 2014 at 8/7c. Check your local listings. (30s)

The Columbia Basin Project

Clip: S24 Ep6 | 1m 5s | In the spring of 1952, work was finally underway on the Columbia Basin Project. (1m 5s)

Diverting the Columbia River

Clip: S24 Ep6 | 2m 40s | The biggest challenge in building Grand Coulee Dam was diverting the flow of the Columbia. (2m 40s)

Grand Coulee Dam: Engineering Challenges

Clip: S24 Ep6 | 2m 46s | The engineering challenges became apparent as soon as construction got underway. (2m 46s)

The Impact of Grand Coulee Dam

Clip: S24 Ep6 | 1m 13s | Grand Coulee Dam was dedicated in front of a crowd of 8,000 on March 22, 1941. (1m 13s)

Grand Coulee Dam Chapter 1

Clip: S24 Ep6 | 13m 16s | Premiering April 3, 2012 at 8/7c. Check your local listings. (13m 16s)

Grand Coulee Dam's Open Spillways

Clip: S24 Ep6 | 15s | This 15-second time-lapse video shows the Grand Coulee Dam's spillway closing. (15s)

Providing Support for PBS.org

Learn Moreabout PBS online sponsorship

Support for PBS provided by:

Corporate sponsorship for American Experience is provided by Liberty Mutual Insurance and Carlisle Companies. Major funding by the Alfred P. Sloan Foundation.

Sign in with Email

or

Continue with GoogleContinue with FacebookContinue with Apple

By creating an account, you acknowledge that PBS may share your information with our member stations and our respective service providers, and that you have read and understand the Privacy Policy and Terms of Use.

Are you sure you want to remove null from My List?