
Smith Mountain Lake: Generating Power, Creating Memories
Smith Mountain Lake: Generating Power, Creating Memories
Special | 58m 58sVideo has Closed Captions
A look at the construction and 50 year history of Smith Mountain Hydro-Electric Project in
Smith Mountain Lake in Virginia has 500 miles of shoreline. Built in the 1960s, the lake provides recreation and a home to many but its main purpose remains the same–to generate electricity. The program explores the lake’s history and the communities that were flooded. Included are first-hand accounts from those who built the lake, plus archival photos and footage of the lake through the years.
Problems playing video? | Closed Captioning Feedback
Problems playing video? | Closed Captioning Feedback
Smith Mountain Lake: Generating Power, Creating Memories is a local public television program presented by Blue Ridge/Appalachia VA
Production funding was provided through a grant from AEP. Additional support was provided by the Bedford and Franklin County Offices of Economic Development.
Smith Mountain Lake: Generating Power, Creating Memories
Smith Mountain Lake: Generating Power, Creating Memories
Special | 58m 58sVideo has Closed Captions
Smith Mountain Lake in Virginia has 500 miles of shoreline. Built in the 1960s, the lake provides recreation and a home to many but its main purpose remains the same–to generate electricity. The program explores the lake’s history and the communities that were flooded. Included are first-hand accounts from those who built the lake, plus archival photos and footage of the lake through the years.
Problems playing video? | Closed Captioning Feedback
How to Watch Smith Mountain Lake: Generating Power, Creating Memories
Smith Mountain Lake: Generating Power, Creating Memories is available to stream on pbs.org and the free PBS App, available on iPhone, Apple TV, Android TV, Android smartphones, Amazon Fire TV, Amazon Fire Tablet, Roku, Samsung Smart TV, and Vizio.
Interview with Smith Mountain Dam Designer, Dr. Fong
Clip: Special | 21m 8s | Memories from the man who designed Smith Mountain and Leesville Dams (21m 8s)
Providing Support for PBS.org
Learn Moreabout PBS online sponsorshipSupport for PBS provided by:
Smith Mountain Lake: Generating Power, Creating Memories is a local public television program presented by Blue Ridge/Appalachia VA
Production funding was provided through a grant from AEP. Additional support was provided by the Bedford and Franklin County Offices of Economic Development.